EV Charge Cost

Toyota in Missouri, EIA August 2026 prices

Cost to charge a Toyota bZ in Missouri

Charging a 2027 Toyota bZ AWD (28.0 kWh per 100 miles, EPA) at Missouri's average residential price of 16.02¢/kWh costs about $4.48 per 100 miles and $50.46 a month for 13,500 miles a year. A full charge from empty (288 miles EPA range) costs about $12.92.

Per month

$50.46

13,500 mi a year

Per 100 miles
$4.4816.02¢/kWh
Per year
$605.46vs $1,865.25 for gas
Full charge
$12.92288 mi EPA range
Per month
$50.4613,500 mi a year

Calculate for your Toyota bZ

Live EIA prices and EPA efficiency. Updates as you type.

Public charging (optional)

2027 Toyota bZ AWD in Missouri at 16.02¢/kWh:

Per month
$50.46
Per year
$605.46
Per 100 miles
$4.48
Full charge (288 mi)
$12.92

Based on 28.0 kWh per 100 miles (EPA, measured at the wall) and 13,500 miles a year — about 315 kWh a month.

Toyota bZ trims: charging cost in Missouri

EPA efficiency and range for every current trim.

Toyota bZ home charging cost in Missouri at 16.02¢/kWh
TrimkWh/100 miEPA rangePer 100 milesPer monthFull charge
2027 Toyota bZ (energy capacity 191 Ah)25.5314 mi$4.09$45.97$12.83
2027 Toyota bZ (energy capacity 200 Ah)25.8236 mi$4.14$46.56$9.77
2027 Toyota bZ AWD28.0288 mi$4.48$50.46$12.92
2027 Toyota bZ AWD Limited28.9278 mi$4.63$52.13$12.88
2027 Toyota bZ Limited26.9299 mi$4.30$48.41$12.87
2027 Toyota bZ Woodland AWD 235/60R1829.0281 mi$4.65$52.27$13.05
2027 Toyota bZ Woodland AWD 235/65R1830.6260 mi$4.90$55.12$12.74
2026 Toyota bZ (energy capacity 191 Ah)25.5314 mi$4.09$45.97$12.83
2026 Toyota bZ (energy capacity 200 Ah)25.8236 mi$4.14$46.56$9.77
2026 Toyota bZ AWD28.0288 mi$4.48$50.46$12.92
2026 Toyota bZ AWD Limited28.9278 mi$4.63$52.13$12.88
2026 Toyota bZ Limited (energy capacity 191 Ah)26.9299 mi$4.30$48.41$12.87
2026 Toyota bZ Limited (energy capacity 200 Ah)27.5296 mi$4.40$49.54$13.03
2026 Toyota bZ Woodland AWD 235/60R1829.0281 mi$4.65$52.27$13.05
2026 Toyota bZ Woodland AWD 235/65R1830.6260 mi$4.90$55.12$12.74

Charging time at home

Miles of range added per hour of charging.

Level 1, 120 V5.1 mi/h
Level 2, 32 A27.4 mi/h
Level 2, 48 A41.1 mi/h
Based on 28.0 kWh/100 mi (EPA). The car's onboard charger may cap AC charging.

The 2027 Toyota bZ AWD adds about 5.1 miles of range per hour on a 120 V outlet and 27.4 miles per hour on a 240 V, 32 A charger, based on its EPA efficiency. Try other chargers in the charging time calculator.

Toyota bZ vs a gas car in Missouri

Toyota bZ$605.46
30 mpg gas car$1,865.25
13,500 miles a year

With regular gasoline at $4.145 a gallon (EIA Midwest average, October 19, 2026), a 30 mpg car costs $1,865.25 a year to fuel for 13,500 miles. The Toyota bZ costs $605.46 — $1,259.79 less.

Charging a Toyota bZ in nearby states

2027 Toyota bZ AWD monthly charging cost, Missouri and neighboring states
StateElectricity (¢/kWh)Per 100 milesPer month
Tennessee13.42$3.76$42.27
Nebraska13.54$3.79$42.64
Kentucky13.80$3.86$43.46
Arkansas14.37$4.02$45.26
Oklahoma14.82$4.15$46.68
Kansas15.47$4.33$48.72
Missouri this page16.02$4.48$50.46
Iowa17.06$4.78$53.73
Illinois19.32$5.41$60.85

Other EVs in Missouri

See the Toyota bZ charging cost in every state or all EVs in Missouri.

Questions people ask

How much does it cost to charge a Toyota bZ in Missouri?

About $4.48 per 100 miles and $50.46 a month for 13,500 miles a year, for the 2027 Toyota bZ AWD (28.0 kWh/100 mi) at 16.02¢/kWh.

How much is a full charge for a Toyota bZ in Missouri?

About $12.92 for 80.6 kWh from the wall, enough for the 288-mile EPA range of the 2027 Toyota bZ AWD.

How long does it take to charge a Toyota bZ at home?

Adding 100 miles takes about 19 h 26 min on a 120 V Level 1 outlet and 3 h 39 min on a 32 A Level 2 charger (7.68 kW).

Is a Toyota bZ cheaper to run than a gas car in Missouri?

On fuel, yes: $605.46 a year versus $1,865.25 for a 30 mpg car at $4.145/gal.

Data updated October 26, 2026. Sources: EIA Electric Power Monthly (August 2026 residential prices), EIA weekly gasoline prices (October 19, 2026), EPA vehicle data. See the methodology.