EV Charge Cost

Toyota in New York, EIA August 2026 prices

Cost to charge a Toyota bZ in New York

Charging a 2027 Toyota bZ AWD (28.0 kWh per 100 miles, EPA) at New York's average residential price of 28.65¢/kWh costs about $8.02 per 100 miles and $90.23 a month for 13,500 miles a year. A full charge from empty (288 miles EPA range) costs about $23.10.

Per month

$90.23

13,500 mi a year

Per 100 miles
$8.0228.65¢/kWh
Per year
$1,082.80vs $1,940.40 for gas
Full charge
$23.10288 mi EPA range
Per month
$90.2313,500 mi a year

Calculate for your Toyota bZ

Live EIA prices and EPA efficiency. Updates as you type.

Public charging (optional)

2027 Toyota bZ AWD in New York at 28.65¢/kWh:

Per month
$90.23
Per year
$1,083
Per 100 miles
$8.02
Full charge (288 mi)
$23.10

Based on 28.0 kWh per 100 miles (EPA, measured at the wall) and 13,500 miles a year — about 315 kWh a month.

Toyota bZ trims: charging cost in New York

EPA efficiency and range for every current trim.

Toyota bZ home charging cost in New York at 28.65¢/kWh
TrimkWh/100 miEPA rangePer 100 milesPer monthFull charge
2027 Toyota bZ (energy capacity 191 Ah)25.5314 mi$7.31$82.20$22.94
2027 Toyota bZ (energy capacity 200 Ah)25.8236 mi$7.40$83.27$17.47
2027 Toyota bZ AWD28.0288 mi$8.02$90.23$23.10
2027 Toyota bZ AWD Limited28.9278 mi$8.29$93.22$23.04
2027 Toyota bZ Limited26.9299 mi$7.70$86.58$23.01
2027 Toyota bZ Woodland AWD 235/60R1829.0281 mi$8.31$93.47$23.35
2027 Toyota bZ Woodland AWD 235/65R1830.6260 mi$8.76$98.58$22.78
2026 Toyota bZ (energy capacity 191 Ah)25.5314 mi$7.31$82.20$22.94
2026 Toyota bZ (energy capacity 200 Ah)25.8236 mi$7.40$83.27$17.47
2026 Toyota bZ AWD28.0288 mi$8.02$90.23$23.10
2026 Toyota bZ AWD Limited28.9278 mi$8.29$93.22$23.04
2026 Toyota bZ Limited (energy capacity 191 Ah)26.9299 mi$7.70$86.58$23.01
2026 Toyota bZ Limited (energy capacity 200 Ah)27.5296 mi$7.88$88.60$23.31
2026 Toyota bZ Woodland AWD 235/60R1829.0281 mi$8.31$93.47$23.35
2026 Toyota bZ Woodland AWD 235/65R1830.6260 mi$8.76$98.58$22.78

Charging time at home

Miles of range added per hour of charging.

Level 1, 120 V5.1 mi/h
Level 2, 32 A27.4 mi/h
Level 2, 48 A41.1 mi/h
Based on 28.0 kWh/100 mi (EPA). The car's onboard charger may cap AC charging.

The 2027 Toyota bZ AWD adds about 5.1 miles of range per hour on a 120 V outlet and 27.4 miles per hour on a 240 V, 32 A charger, based on its EPA efficiency. Try other chargers in the charging time calculator.

Toyota bZ vs a gas car in New York

Toyota bZ$1,082.80
30 mpg gas car$1,940.40
13,500 miles a year

With regular gasoline at $4.312 a gallon (EIA Central Atlantic average, October 19, 2026), a 30 mpg car costs $1,940.40 a year to fuel for 13,500 miles. The Toyota bZ costs $1,082.80 — $857.60 less.

Charging a Toyota bZ in nearby states

2027 Toyota bZ AWD monthly charging cost, New York and neighboring states
StateElectricity (¢/kWh)Per 100 milesPer month
Pennsylvania21.77$6.09$68.56
Vermont23.84$6.67$75.08
Connecticut24.51$6.86$77.19
New Jersey24.61$6.89$77.51
New York this page28.65$8.02$90.23
Massachusetts30.48$8.53$96.00

Other EVs in New York

See the Toyota bZ charging cost in every state or all EVs in New York.

Questions people ask

How much does it cost to charge a Toyota bZ in New York?

About $8.02 per 100 miles and $90.23 a month for 13,500 miles a year, for the 2027 Toyota bZ AWD (28.0 kWh/100 mi) at 28.65¢/kWh.

How much is a full charge for a Toyota bZ in New York?

About $23.10 for 80.6 kWh from the wall, enough for the 288-mile EPA range of the 2027 Toyota bZ AWD.

How long does it take to charge a Toyota bZ at home?

Adding 100 miles takes about 19 h 26 min on a 120 V Level 1 outlet and 3 h 39 min on a 32 A Level 2 charger (7.68 kW).

Is a Toyota bZ cheaper to run than a gas car in New York?

On fuel, yes: $1,082.80 a year versus $1,940.40 for a 30 mpg car at $4.312/gal.

Data updated October 26, 2026. Sources: EIA Electric Power Monthly (August 2026 residential prices), EIA weekly gasoline prices (October 19, 2026), EPA vehicle data. See the methodology.