EV Charge Cost

Toyota in Oregon, EIA August 2026 prices

Cost to charge a Toyota bZ in Oregon

Charging a 2027 Toyota bZ AWD (28.0 kWh per 100 miles, EPA) at Oregon's average residential price of 15.92¢/kWh costs about $4.46 per 100 miles and $50.14 a month for 13,500 miles a year. A full charge from empty (288 miles EPA range) costs about $12.84.

Per month

$50.14

13,500 mi a year

Per 100 miles
$4.4615.92¢/kWh
Per year
$601.68vs $2,253.15 for gas
Full charge
$12.84288 mi EPA range
Per month
$50.1413,500 mi a year

Calculate for your Toyota bZ

Live EIA prices and EPA efficiency. Updates as you type.

Public charging (optional)

2027 Toyota bZ AWD in Oregon at 15.92¢/kWh:

Per month
$50.14
Per year
$601.68
Per 100 miles
$4.46
Full charge (288 mi)
$12.84

Based on 28.0 kWh per 100 miles (EPA, measured at the wall) and 13,500 miles a year — about 315 kWh a month.

Toyota bZ trims: charging cost in Oregon

EPA efficiency and range for every current trim.

Toyota bZ home charging cost in Oregon at 15.92¢/kWh
TrimkWh/100 miEPA rangePer 100 milesPer monthFull charge
2027 Toyota bZ (energy capacity 191 Ah)25.5314 mi$4.06$45.68$12.75
2027 Toyota bZ (energy capacity 200 Ah)25.8236 mi$4.11$46.27$9.71
2027 Toyota bZ AWD28.0288 mi$4.46$50.14$12.84
2027 Toyota bZ AWD Limited28.9278 mi$4.60$51.80$12.80
2027 Toyota bZ Limited26.9299 mi$4.28$48.11$12.79
2027 Toyota bZ Woodland AWD 235/60R1829.0281 mi$4.62$51.94$12.97
2027 Toyota bZ Woodland AWD 235/65R1830.6260 mi$4.87$54.78$12.66
2026 Toyota bZ (energy capacity 191 Ah)25.5314 mi$4.06$45.68$12.75
2026 Toyota bZ (energy capacity 200 Ah)25.8236 mi$4.11$46.27$9.71
2026 Toyota bZ AWD28.0288 mi$4.46$50.14$12.84
2026 Toyota bZ AWD Limited28.9278 mi$4.60$51.80$12.80
2026 Toyota bZ Limited (energy capacity 191 Ah)26.9299 mi$4.28$48.11$12.79
2026 Toyota bZ Limited (energy capacity 200 Ah)27.5296 mi$4.38$49.23$12.95
2026 Toyota bZ Woodland AWD 235/60R1829.0281 mi$4.62$51.94$12.97
2026 Toyota bZ Woodland AWD 235/65R1830.6260 mi$4.87$54.78$12.66

Charging time at home

Miles of range added per hour of charging.

Level 1, 120 V5.1 mi/h
Level 2, 32 A27.4 mi/h
Level 2, 48 A41.1 mi/h
Based on 28.0 kWh/100 mi (EPA). The car's onboard charger may cap AC charging.

The 2027 Toyota bZ AWD adds about 5.1 miles of range per hour on a 120 V outlet and 27.4 miles per hour on a 240 V, 32 A charger, based on its EPA efficiency. Try other chargers in the charging time calculator.

Toyota bZ vs a gas car in Oregon

Toyota bZ$601.68
30 mpg gas car$2,253.15
13,500 miles a year

With regular gasoline at $5.007 a gallon (EIA West Coast (excluding California) average, October 19, 2026), a 30 mpg car costs $2,253.15 a year to fuel for 13,500 miles. The Toyota bZ costs $601.68 — $1,651.47 less.

Charging a Toyota bZ in nearby states

2027 Toyota bZ AWD monthly charging cost, Oregon and neighboring states
StateElectricity (¢/kWh)Per 100 milesPer month
Nevada12.72$3.56$40.06
Idaho13.37$3.74$42.11
Washington14.63$4.10$46.08
Oregon this page15.92$4.46$50.14
California29.75$8.33$93.70

Other EVs in Oregon

See the Toyota bZ charging cost in every state or all EVs in Oregon.

Questions people ask

How much does it cost to charge a Toyota bZ in Oregon?

About $4.46 per 100 miles and $50.14 a month for 13,500 miles a year, for the 2027 Toyota bZ AWD (28.0 kWh/100 mi) at 15.92¢/kWh.

How much is a full charge for a Toyota bZ in Oregon?

About $12.84 for 80.6 kWh from the wall, enough for the 288-mile EPA range of the 2027 Toyota bZ AWD.

How long does it take to charge a Toyota bZ at home?

Adding 100 miles takes about 19 h 26 min on a 120 V Level 1 outlet and 3 h 39 min on a 32 A Level 2 charger (7.68 kW).

Is a Toyota bZ cheaper to run than a gas car in Oregon?

On fuel, yes: $601.68 a year versus $2,253.15 for a 30 mpg car at $5.007/gal.

Data updated October 26, 2026. Sources: EIA Electric Power Monthly (August 2026 residential prices), EIA weekly gasoline prices (October 19, 2026), EPA vehicle data. See the methodology.