Audi, 2027 model years, EPA data
Audi S6 e-tron charging cost and time
The 2027 Audi S6 e-tron (21 inch wheels) uses 33.8 kWh per 100 miles (EPA). Charging it at home costs about $6.14 per 100 miles and $69.03 a month at the U.S. average price of 18.16¢/kWh (August 2026); a full charge is about $19.08.
Per month
$69.0313,500 mi a year
- Efficiency
- 33.8kWh per 100 miles
- EPA range
- 311 mirepresentative trim
- Per 100 miles
- $6.1418.16¢/kWh
- Per month
- $69.0313,500 mi a year
Calculate for your Audi S6 e-tron
Live EIA prices and EPA efficiency. Updates as you type.
Audi S6 e-tron charging cost across the U.S.
Monthly home charging cost for the 2027 Audi S6 e-tron (21 inch wheels), 13,500 miles a year.
Audi S6 e-tron trims
EPA efficiency, range and cost at 18.16¢/kWh.
| Trim | Class | kWh/100 mi | EPA range | Per 100 miles | Full charge |
|---|---|---|---|---|---|
| 2027 Audi S6 e-tron (20 inch wheels) | Large Cars | 32.7 | 326 mi | $5.93 | $19.33 |
| 2027 Audi S6 e-tron (21 inch wheels) | Large Cars | 33.8 | 311 mi | $6.14 | $19.08 |
Audi S6 e-tron charging cost by state
Cheapest to most expensive.
| State | Electricity (¢/kWh) | Per 100 miles | Per month | Full charge |
|---|---|---|---|---|
| Nevada | 12.72 | $4.30 | $48.35 | $13.37 |
| Louisiana | 12.87 | $4.35 | $48.92 | $13.52 |
| North Dakota | 13.31 | $4.50 | $50.60 | $13.99 |
| Utah | 13.31 | $4.50 | $50.60 | $13.99 |
| Idaho | 13.37 | $4.52 | $50.82 | $14.05 |
| Tennessee | 13.42 | $4.53 | $51.01 | $14.10 |
| Nebraska | 13.54 | $4.58 | $51.47 | $14.23 |
| Kentucky | 13.80 | $4.66 | $52.46 | $14.50 |
| Arkansas | 14.37 | $4.86 | $54.62 | $15.10 |
| Mississippi | 14.43 | $4.88 | $54.85 | $15.16 |
| Wyoming | 14.43 | $4.88 | $54.85 | $15.16 |
| Washington | 14.63 | $4.94 | $55.61 | $15.37 |
| Oklahoma | 14.82 | $5.01 | $56.34 | $15.57 |
| North Carolina | 14.95 | $5.05 | $56.83 | $15.71 |
| Florida | 14.99 | $5.07 | $56.98 | $15.75 |
| Arizona | 15.05 | $5.09 | $57.21 | $15.82 |
| South Dakota | 15.15 | $5.12 | $57.59 | $15.92 |
| Kansas | 15.47 | $5.23 | $58.81 | $16.26 |
| Montana | 15.57 | $5.26 | $59.19 | $16.36 |
| South Carolina | 15.76 | $5.33 | $59.91 | $16.56 |
| Georgia | 15.90 | $5.37 | $60.44 | $16.71 |
| Texas | 15.91 | $5.38 | $60.48 | $16.72 |
| Oregon | 15.92 | $5.38 | $60.52 | $16.73 |
| Missouri | 16.02 | $5.41 | $60.90 | $16.83 |
| West Virginia | 16.31 | $5.51 | $62.00 | $17.14 |
| Alabama | 16.33 | $5.52 | $62.08 | $17.16 |
| New Mexico | 16.51 | $5.58 | $62.76 | $17.35 |
| Indiana | 17.02 | $5.75 | $64.70 | $17.89 |
| Iowa | 17.06 | $5.76 | $64.85 | $17.93 |
| Colorado | 17.17 | $5.80 | $65.27 | $18.04 |
| Minnesota | 17.20 | $5.81 | $65.38 | $18.07 |
| Virginia | 17.64 | $5.96 | $67.05 | $18.54 |
| Delaware | 18.70 | $6.32 | $71.08 | $19.65 |
| Illinois | 19.32 | $6.53 | $73.44 | $20.30 |
| Ohio | 19.38 | $6.55 | $73.67 | $20.37 |
| Wisconsin | 19.41 | $6.56 | $73.78 | $20.40 |
| Maryland | 21.40 | $7.23 | $81.35 | $22.49 |
| Pennsylvania | 21.77 | $7.36 | $82.75 | $22.88 |
| Michigan | 22.99 | $7.77 | $87.39 | $24.16 |
| Vermont | 23.84 | $8.06 | $90.62 | $25.05 |
| Connecticut | 24.51 | $8.28 | $93.17 | $25.76 |
| New Jersey | 24.61 | $8.32 | $93.55 | $25.86 |
| District of Columbia | 25.98 | $8.78 | $98.76 | $27.30 |
| New Hampshire | 27.64 | $9.34 | $105.07 | $29.05 |
| Rhode Island | 28.18 | $9.52 | $107.12 | $29.61 |
| New York | 28.65 | $9.68 | $108.91 | $30.11 |
| Alaska | 29.41 | $9.94 | $111.80 | $30.91 |
| California | 29.75 | $10.05 | $113.09 | $31.26 |
| Massachusetts | 30.48 | $10.30 | $115.86 | $32.03 |
| Maine | 32.11 | $10.85 | $122.06 | $33.74 |
| Hawaii | 47.18 | $15.94 | $179.35 | $49.58 |
Charging time
Time to add 100 miles of range to the 2027 Audi S6 e-tron (21 inch wheels).
- Level 1, 1.44 kW
120 V, 12 A
23 h 28 min per 100 mi4.3 miles of range per hour
- Level 2, 3.84 kW
240 V, 16 A
8 h 48 min per 100 mi11.4 miles of range per hour
- Level 2, 7.68 kW
240 V, 32 A
4 h 24 min per 100 mi22.7 miles of range per hour
- Level 2, 9.60 kW
240 V, 40 A
3 h 31 min per 100 mi28.4 miles of range per hour
- Level 2, 11.52 kW
240 V, 48 A
2 h 56 min per 100 mi34.1 miles of range per hour
Full charge from empty
| Charger | Power | Time from empty | Range added per hour |
|---|---|---|---|
| Level 1 — 120 V, 12 A | 1.44 kW | 72 h 59 min | 4 mi |
| Level 2 — 240 V, 16 A | 3.84 kW | 27 h 22 min | 11 mi |
| Level 2 — 240 V, 32 A | 7.68 kW | 13 h 41 min | 23 mi |
| Level 2 — 240 V, 40 A | 9.60 kW | 10 h 57 min | 28 mi |
| Level 2 — 240 V, 48 A | 11.52 kW | 9 h 7 min | 34 mi |
A full charge costs about $19.08 at the U.S. average price of 18.16¢/kWh, however long it takes.
AC charging speed is also limited by the car's onboard charger, and charging slows near 100%. Try the charging time calculator.
Questions people ask
How much does it cost to charge a Audi S6 e-tron?
About $6.14 per 100 miles and $69.03 a month for 13,500 miles a year at the U.S. average price of 18.16¢/kWh, for the 2027 Audi S6 e-tron (21 inch wheels).
How efficient is the Audi S6 e-tron?
EPA rates current Audi S6 e-tron trims at 32.7 to 33.8 kWh per 100 miles, with 311 to 326 miles of range.
Where is it cheapest to charge a Audi S6 e-tron?
Nevada, at about $48.35 a month; the most expensive is Hawaii at $179.35.
How long does a Audi S6 e-tron take to charge at home?
About 23 h 28 min per 100 miles on a 120 V outlet and 4 h 24 min per 100 miles on a 7.68 kW Level 2 charger. From empty to its full 311-mile EPA range: about 13 h 41 min at 7.68 kW and 9 h 7 min at 11.52 kW, if the car's onboard charger accepts that power.
How many kWh does it take to charge a Audi S6 e-tron?
About 105 kWh from the wall to go from empty to the full 311-mile EPA range of the 2027 Audi S6 e-tron (21 inch wheels) (311 mi × 33.8 kWh/100 mi). That includes charging losses, so it is a little more than the battery holds. At 18.16¢/kWh that is about $19.08.