Jeep, 2026 model years, EPA data
Jeep Recon charging cost and time
The 2026 Jeep Recon Moab 4WD uses 47.6 kWh per 100 miles (EPA). Charging it at home costs about $8.64 per 100 miles and $97.17 a month at the U.S. average price of 18.16¢/kWh (August 2026); a full charge is about $19.17.
Per month
$97.1713,500 mi a year
- Efficiency
- 47.6kWh per 100 miles
- EPA range
- 222 mirepresentative trim
- Per 100 miles
- $8.6418.16¢/kWh
- Per month
- $97.1713,500 mi a year
Calculate for your Jeep Recon
Live EIA prices and EPA efficiency. Updates as you type.
Jeep Recon charging cost across the U.S.
Monthly home charging cost for the 2026 Jeep Recon Moab 4WD, 13,500 miles a year.
Jeep Recon trims
EPA efficiency, range and cost at 18.16¢/kWh.
| Trim | Class | kWh/100 mi | EPA range | Per 100 miles | Full charge |
|---|---|---|---|---|---|
| 2026 Jeep Recon Moab 4WD | Small Sport Utility Vehicle 4WD | 47.6 | 222 mi | $8.64 | $19.17 |
Jeep Recon charging cost by state
Cheapest to most expensive.
| State | Electricity (¢/kWh) | Per 100 miles | Per month | Full charge |
|---|---|---|---|---|
| Nevada | 12.72 | $6.05 | $68.06 | $13.43 |
| Louisiana | 12.87 | $6.12 | $68.86 | $13.59 |
| North Dakota | 13.31 | $6.33 | $71.22 | $14.05 |
| Utah | 13.31 | $6.33 | $71.22 | $14.05 |
| Idaho | 13.37 | $6.36 | $71.54 | $14.12 |
| Tennessee | 13.42 | $6.38 | $71.81 | $14.17 |
| Nebraska | 13.54 | $6.44 | $72.45 | $14.30 |
| Kentucky | 13.80 | $6.56 | $73.84 | $14.57 |
| Arkansas | 14.37 | $6.83 | $76.89 | $15.17 |
| Mississippi | 14.43 | $6.86 | $77.21 | $15.24 |
| Wyoming | 14.43 | $6.86 | $77.21 | $15.24 |
| Washington | 14.63 | $6.96 | $78.28 | $15.45 |
| Oklahoma | 14.82 | $7.05 | $79.30 | $15.65 |
| North Carolina | 14.95 | $7.11 | $79.99 | $15.79 |
| Florida | 14.99 | $7.13 | $80.21 | $15.83 |
| Arizona | 15.05 | $7.16 | $80.53 | $15.89 |
| South Dakota | 15.15 | $7.21 | $81.06 | $16.00 |
| Kansas | 15.47 | $7.36 | $82.78 | $16.33 |
| Montana | 15.57 | $7.41 | $83.31 | $16.44 |
| South Carolina | 15.76 | $7.50 | $84.33 | $16.64 |
| Georgia | 15.90 | $7.56 | $85.08 | $16.79 |
| Texas | 15.91 | $7.57 | $85.13 | $16.80 |
| Oregon | 15.92 | $7.57 | $85.18 | $16.81 |
| Missouri | 16.02 | $7.62 | $85.72 | $16.92 |
| West Virginia | 16.31 | $7.76 | $87.27 | $17.22 |
| Alabama | 16.33 | $7.77 | $87.38 | $17.24 |
| New Mexico | 16.51 | $7.85 | $88.34 | $17.43 |
| Indiana | 17.02 | $8.10 | $91.07 | $17.97 |
| Iowa | 17.06 | $8.11 | $91.28 | $18.01 |
| Colorado | 17.17 | $8.17 | $91.87 | $18.13 |
| Minnesota | 17.20 | $8.18 | $92.03 | $18.16 |
| Virginia | 17.64 | $8.39 | $94.39 | $18.63 |
| Delaware | 18.70 | $8.89 | $100.06 | $19.74 |
| Illinois | 19.32 | $9.19 | $103.38 | $20.40 |
| Ohio | 19.38 | $9.22 | $103.70 | $20.46 |
| Wisconsin | 19.41 | $9.23 | $103.86 | $20.49 |
| Maryland | 21.40 | $10.18 | $114.51 | $22.60 |
| Pennsylvania | 21.77 | $10.35 | $116.49 | $22.99 |
| Michigan | 22.99 | $10.93 | $123.01 | $24.27 |
| Vermont | 23.84 | $11.34 | $127.56 | $25.17 |
| Connecticut | 24.51 | $11.66 | $131.15 | $25.88 |
| New Jersey | 24.61 | $11.71 | $131.68 | $25.99 |
| District of Columbia | 25.98 | $12.36 | $139.01 | $27.43 |
| New Hampshire | 27.64 | $13.15 | $147.89 | $29.18 |
| Rhode Island | 28.18 | $13.40 | $150.78 | $29.75 |
| New York | 28.65 | $13.63 | $153.30 | $30.25 |
| Alaska | 29.41 | $13.99 | $157.36 | $31.05 |
| California | 29.75 | $14.15 | $159.18 | $31.41 |
| Massachusetts | 30.48 | $14.50 | $163.09 | $32.18 |
| Maine | 32.11 | $15.27 | $171.81 | $33.90 |
| Hawaii | 47.18 | $22.44 | $252.45 | $49.82 |
Charging time
Time to add 100 miles of range to the 2026 Jeep Recon Moab 4WD.
- Level 1, 1.44 kW
120 V, 12 A
33 h 2 min per 100 mi3.0 miles of range per hour
- Level 2, 3.84 kW
240 V, 16 A
12 h 23 min per 100 mi8.1 miles of range per hour
- Level 2, 7.68 kW
240 V, 32 A
6 h 11 min per 100 mi16.1 miles of range per hour
- Level 2, 9.60 kW
240 V, 40 A
4 h 57 min per 100 mi20.2 miles of range per hour
- Level 2, 11.52 kW
240 V, 48 A
4 h 8 min per 100 mi24.2 miles of range per hour
Full charge from empty
| Charger | Power | Time from empty | Range added per hour |
|---|---|---|---|
| Level 1 — 120 V, 12 A | 1.44 kW | 73 h 19 min | 3 mi |
| Level 2 — 240 V, 16 A | 3.84 kW | 27 h 30 min | 8 mi |
| Level 2 — 240 V, 32 A | 7.68 kW | 13 h 45 min | 16 mi |
| Level 2 — 240 V, 40 A | 9.60 kW | 11 h | 20 mi |
| Level 2 — 240 V, 48 A | 11.52 kW | 9 h 10 min | 24 mi |
A full charge costs about $19.17 at the U.S. average price of 18.16¢/kWh, however long it takes.
AC charging speed is also limited by the car's onboard charger, and charging slows near 100%. Try the charging time calculator.
Questions people ask
How much does it cost to charge a Jeep Recon?
About $8.64 per 100 miles and $97.17 a month for 13,500 miles a year at the U.S. average price of 18.16¢/kWh, for the 2026 Jeep Recon Moab 4WD.
How efficient is the Jeep Recon?
EPA rates current Jeep Recon trims at 47.6 kWh per 100 miles, with 222 miles of range.
Where is it cheapest to charge a Jeep Recon?
Nevada, at about $68.06 a month; the most expensive is Hawaii at $252.45.
How long does a Jeep Recon take to charge at home?
About 33 h 2 min per 100 miles on a 120 V outlet and 6 h 11 min per 100 miles on a 7.68 kW Level 2 charger. From empty to its full 222-mile EPA range: about 13 h 45 min at 7.68 kW and 9 h 10 min at 11.52 kW, if the car's onboard charger accepts that power.
How many kWh does it take to charge a Jeep Recon?
About 106 kWh from the wall to go from empty to the full 222-mile EPA range of the 2026 Jeep Recon Moab 4WD (222 mi × 47.6 kWh/100 mi). That includes charging losses, so it is a little more than the battery holds. At 18.16¢/kWh that is about $19.17.