EV Charge Cost

Lucid, 2025–2027 model years, EPA data

Lucid Air charging cost and time

The 2027 Lucid Air Touring AWD with 20 inch wheels uses 27.3 kWh per 100 miles (EPA). Charging it at home costs about $4.96 per 100 miles and $55.79 a month at the U.S. average price of 18.16¢/kWh (August 2026); a full charge is about $19.64.

Per month

$55.79

13,500 mi a year

Efficiency
27.3kWh per 100 miles
EPA range
396 mirepresentative trim
Per 100 miles
$4.9618.16¢/kWh
Per month
$55.7913,500 mi a year

Calculate for your Lucid Air

Live EIA prices and EPA efficiency. Updates as you type.

Public charging (optional)

2027 Lucid Air Touring AWD with 20 inch wheels in Virginia at 17.64¢/kWh:

Per month
$54.19
Per year
$650.25
Per 100 miles
$4.82
Full charge (396 mi)
$19.07

Based on 27.3 kWh per 100 miles (EPA, measured at the wall) and 13,500 miles a year — about 307 kWh a month.

Lucid Air charging cost across the U.S.

Monthly home charging cost for the 2027 Lucid Air Touring AWD with 20 inch wheels, 13,500 miles a year.

Lucid Air trims

EPA efficiency, range and cost at 18.16¢/kWh.

Lucid Air trims: EPA efficiency, range and cost at 18.16¢/kWh
TrimClasskWh/100 miEPA rangePer 100 milesFull charge
2027 Lucid Air G Touring XR AWD with 20 inch wheelsLarge Cars28.2480 mi$5.11$24.55
2027 Lucid Air G Touring XR AWD with 21 inch wheelsLarge Cars30.1446 mi$5.47$24.40
2027 Lucid Air G Touring XR AWD with19 inch wheelsLarge Cars26.4512 mi$4.80$24.57
2027 Lucid Air Pure RWD with 19 inch wheelsLarge Cars23.1420 mi$4.20$17.65
2027 Lucid Air Pure RWD with 20 inch wheelsLarge Cars26.1372 mi$4.74$17.63
2027 Lucid Air Sapphire AWDLarge Cars32.1427 mi$5.84$24.92
2027 Lucid Air Touring AWD with 19 inch wheelsLarge Cars25.2431 mi$4.57$19.72
2027 Lucid Air Touring AWD with 20 inch wheelsLarge Cars27.3396 mi$4.96$19.64
2026 Lucid Air G Touring XR AWD with 20 inch wheelsLarge Cars28.2480 mi$5.11$24.55
2026 Lucid Air G Touring XR AWD with 21 inch wheelsLarge Cars30.1446 mi$5.47$24.40
2026 Lucid Air G Touring XR AWD with19 inch wheelsLarge Cars26.4512 mi$4.80$24.57
2026 Lucid Air Pure RWD with 19 inch wheelsLarge Cars23.1420 mi$4.20$17.65
2026 Lucid Air Pure RWD with 20 inch wheelsLarge Cars26.1372 mi$4.74$17.63
2026 Lucid Air Sapphire AWDLarge Cars32.1427 mi$5.84$24.92
2026 Lucid Air Touring AWD with 19 inch wheelsLarge Cars25.2431 mi$4.57$19.72
2026 Lucid Air Touring AWD with 20 inch wheelsLarge Cars27.3396 mi$4.96$19.64
2025 Lucid Air G Touring XR AWD with 19 inch wheelsLarge Cars26.4512 mi$4.80$24.57
2025 Lucid Air G Touring XR AWD with 20 inch wheelsLarge Cars28.2480 mi$5.11$24.55
2025 Lucid Air G Touring XR AWD with 21 inch wheelsLarge Cars30.1446 mi$5.47$24.40
2025 Lucid Air Pure RWD with 19 inch wheelsLarge Cars23.1420 mi$4.20$17.65
2025 Lucid Air Pure RWD with 20 inch wheelsLarge Cars26.1372 mi$4.74$17.63
2025 Lucid Air Sapphire AWDLarge Cars32.1427 mi$5.84$24.92
2025 Lucid Air Touring AWD with 19 inch wheelsLarge Cars25.6406 mi$4.65$18.86
2025 Lucid Air Touring AWD with 20 inch wheelsLarge Cars27.8377 mi$5.04$19.00
2025 Lucid Air Touring AWD with 21 inch wheelsLarge Cars28.9361 mi$5.26$18.97

Lucid Air charging cost by state

Cheapest to most expensive.

2027 Lucid Air Touring AWD with 20 inch wheels home charging cost by state, 13,500 miles a year, August 2026
StateElectricity (¢/kWh)Per 100 milesPer monthFull charge
Nevada12.72$3.47$39.07$13.75
Louisiana12.87$3.51$39.53$13.92
North Dakota13.31$3.63$40.89$14.39
Utah13.31$3.63$40.89$14.39
Idaho13.37$3.65$41.07$14.46
Tennessee13.42$3.66$41.22$14.51
Nebraska13.54$3.70$41.59$14.64
Kentucky13.80$3.77$42.39$14.92
Arkansas14.37$3.92$44.14$15.54
Mississippi14.43$3.94$44.33$15.60
Wyoming14.43$3.94$44.33$15.60
Washington14.63$3.99$44.94$15.82
Oklahoma14.82$4.05$45.53$16.02
North Carolina14.95$4.08$45.92$16.17
Florida14.99$4.09$46.05$16.21
Arizona15.05$4.11$46.23$16.27
South Dakota15.15$4.14$46.54$16.38
Kansas15.47$4.22$47.52$16.73
Montana15.57$4.25$47.83$16.84
South Carolina15.76$4.30$48.41$17.04
Georgia15.90$4.34$48.84$17.19
Texas15.91$4.34$48.87$17.20
Oregon15.92$4.35$48.90$17.21
Missouri16.02$4.37$49.21$17.32
West Virginia16.31$4.45$50.10$17.64
Alabama16.33$4.46$50.16$17.66
New Mexico16.51$4.51$50.72$17.85
Indiana17.02$4.65$52.28$18.40
Iowa17.06$4.66$52.41$18.45
Colorado17.17$4.69$52.74$18.57
Minnesota17.20$4.70$52.84$18.60
Virginia17.64$4.82$54.19$19.07
Delaware18.70$5.11$57.44$20.22
Illinois19.32$5.28$59.35$20.89
Ohio19.38$5.29$59.53$20.96
Wisconsin19.41$5.30$59.62$20.99
Maryland21.40$5.84$65.74$23.14
Pennsylvania21.77$5.94$66.87$23.54
Michigan22.99$6.28$70.62$24.86
Vermont23.84$6.51$73.23$25.78
Connecticut24.51$6.69$75.29$26.50
New Jersey24.61$6.72$75.60$26.61
District of Columbia25.98$7.09$79.81$28.09
New Hampshire27.64$7.55$84.91$29.89
Rhode Island28.18$7.69$86.57$30.47
New York28.65$7.82$88.01$30.98
Alaska29.41$8.03$90.34$31.80
California29.75$8.12$91.39$32.17
Massachusetts30.48$8.32$93.63$32.96
Maine32.11$8.77$98.64$34.72
Hawaii47.18$12.88$144.93$51.02

Charging time

Time to add 100 miles of range to the 2027 Lucid Air Touring AWD with 20 inch wheels.

  • Level 1, 1.44 kW

    120 V, 12 A

    18 h 58 min per 100 mi

    5.3 miles of range per hour

  • Level 2, 3.84 kW

    240 V, 16 A

    7 h 7 min per 100 mi

    14.1 miles of range per hour

  • Level 2, 7.68 kW

    240 V, 32 A

    3 h 34 min per 100 mi

    28.1 miles of range per hour

  • Level 2, 9.60 kW

    240 V, 40 A

    2 h 50 min per 100 mi

    35.2 miles of range per hour

  • Level 2, 11.52 kW

    240 V, 48 A

    2 h 22 min per 100 mi

    42.2 miles of range per hour

Full charge from empty

2027 Lucid Air Touring AWD with 20 inch wheels: time to charge from empty to full (108 kWh from the wall for 396 mi of EPA range)
ChargerPowerTime from emptyRange added per hour
Level 1 — 120 V, 12 A1.44 kW75 h 5 min5 mi
Level 2 — 240 V, 16 A3.84 kW28 h 10 min14 mi
Level 2 — 240 V, 32 A7.68 kW14 h 5 min28 mi
Level 2 — 240 V, 40 A9.60 kW11 h 16 min35 mi
Level 2 — 240 V, 48 A11.52 kW9 h 23 min42 mi

A full charge costs about $19.64 at the U.S. average price of 18.16¢/kWh, however long it takes.

AC charging speed is also limited by the car's onboard charger, and charging slows near 100%. Try the charging time calculator.

Questions people ask

How much does it cost to charge a Lucid Air?

About $4.96 per 100 miles and $55.79 a month for 13,500 miles a year at the U.S. average price of 18.16¢/kWh, for the 2027 Lucid Air Touring AWD with 20 inch wheels.

How efficient is the Lucid Air?

EPA rates current Lucid Air trims at 23.1 to 32.1 kWh per 100 miles, with 361 to 512 miles of range.

Where is it cheapest to charge a Lucid Air?

Nevada, at about $39.07 a month; the most expensive is Hawaii at $144.93.

How long does a Lucid Air take to charge at home?

About 18 h 58 min per 100 miles on a 120 V outlet and 3 h 34 min per 100 miles on a 7.68 kW Level 2 charger. From empty to its full 396-mile EPA range: about 14 h 5 min at 7.68 kW and 9 h 23 min at 11.52 kW, if the car's onboard charger accepts that power.

How many kWh does it take to charge a Lucid Air?

About 108 kWh from the wall to go from empty to the full 396-mile EPA range of the 2027 Lucid Air Touring AWD with 20 inch wheels (396 mi × 27.3 kWh/100 mi). That includes charging losses, so it is a little more than the battery holds. At 18.16¢/kWh that is about $19.64.

Data updated October 26, 2026. Sources: EIA Electric Power Monthly (August 2026 residential prices), EIA weekly gasoline prices (October 19, 2026), EPA vehicle data. See the methodology.