EV Charge Cost

Tesla, 2025–2026 model years, EPA data

Tesla Model S charging cost and time

The 2025 Tesla Model S Plaid (19in wheels) uses 32.5 kWh per 100 miles (EPA). Charging it at home costs about $5.90 per 100 miles and $66.37 a month at the U.S. average price of 18.16¢/kWh (August 2026); a full charge is about $20.53.

Per month

$66.37

13,500 mi a year

Efficiency
32.5kWh per 100 miles
EPA range
348 mirepresentative trim
Per 100 miles
$5.9018.16¢/kWh
Per month
$66.3713,500 mi a year

Calculate for your Tesla Model S

Live EIA prices and EPA efficiency. Updates as you type.

Public charging (optional)

2025 Tesla Model S Plaid (19in wheels) in Virginia at 17.64¢/kWh:

Per month
$64.47
Per year
$773.64
Per 100 miles
$5.73
Full charge (348 mi)
$19.94

Based on 32.5 kWh per 100 miles (EPA, measured at the wall) and 13,500 miles a year — about 365 kWh a month.

Tesla Model S charging cost across the U.S.

Monthly home charging cost for the 2025 Tesla Model S Plaid (19in wheels), 13,500 miles a year.

Tesla Model S trims

EPA efficiency, range and cost at 18.16¢/kWh.

Tesla Model S trims: EPA efficiency, range and cost at 18.16¢/kWh
TrimClasskWh/100 miEPA rangePer 100 milesFull charge
2026 Tesla Model SLarge Cars27.1410 mi$4.93$20.20
2026 Tesla Model S PlaidLarge Cars30.6368 mi$5.55$20.44
2026 Tesla Model S Plaid (21in wheels)Large Cars36.2309 mi$6.58$20.32
2025 Tesla Model SLarge Cars27.1410 mi$4.93$20.20
2025 Tesla Model S Plaid (19in wheels)Large Cars32.5348 mi$5.90$20.53
2025 Tesla Model S Plaid (21in wheels)Large Cars36.1312 mi$6.56$20.48

Tesla Model S charging cost by state

Cheapest to most expensive.

2025 Tesla Model S Plaid (19in wheels) home charging cost by state, 13,500 miles a year, August 2026
StateElectricity (¢/kWh)Per 100 milesPer monthFull charge
Nevada12.72$4.13$46.49$14.38
Louisiana12.87$4.18$47.04$14.55
North Dakota13.31$4.32$48.64$15.05
Utah13.31$4.32$48.64$15.05
Idaho13.37$4.34$48.86$15.12
Tennessee13.42$4.36$49.05$15.17
Nebraska13.54$4.40$49.49$15.31
Kentucky13.80$4.48$50.44$15.60
Arkansas14.37$4.67$52.52$16.25
Mississippi14.43$4.69$52.74$16.31
Wyoming14.43$4.69$52.74$16.31
Washington14.63$4.75$53.47$16.54
Oklahoma14.82$4.81$54.16$16.75
North Carolina14.95$4.86$54.64$16.90
Florida14.99$4.87$54.78$16.95
Arizona15.05$4.89$55.00$17.01
South Dakota15.15$4.92$55.37$17.13
Kansas15.47$5.03$56.54$17.49
Montana15.57$5.06$56.90$17.60
South Carolina15.76$5.12$57.60$17.82
Georgia15.90$5.17$58.11$17.98
Texas15.91$5.17$58.15$17.99
Oregon15.92$5.17$58.18$18.00
Missouri16.02$5.20$58.55$18.11
West Virginia16.31$5.30$59.61$18.44
Alabama16.33$5.31$59.68$18.46
New Mexico16.51$5.36$60.34$18.67
Indiana17.02$5.53$62.20$19.24
Iowa17.06$5.54$62.35$19.29
Colorado17.17$5.58$62.75$19.41
Minnesota17.20$5.59$62.86$19.45
Virginia17.64$5.73$64.47$19.94
Delaware18.70$6.08$68.34$21.14
Illinois19.32$6.28$70.61$21.84
Ohio19.38$6.30$70.83$21.91
Wisconsin19.41$6.31$70.94$21.94
Maryland21.40$6.95$78.21$24.19
Pennsylvania21.77$7.07$79.56$24.61
Michigan22.99$7.47$84.02$25.99
Vermont23.84$7.74$87.13$26.95
Connecticut24.51$7.96$89.58$27.71
New Jersey24.61$8.00$89.94$27.82
District of Columbia25.98$8.44$94.95$29.37
New Hampshire27.64$8.98$101.02$31.25
Rhode Island28.18$9.15$102.99$31.86
New York28.65$9.31$104.71$32.39
Alaska29.41$9.55$107.49$33.25
California29.75$9.66$108.73$33.63
Massachusetts30.48$9.90$111.40$34.46
Maine32.11$10.43$117.35$36.30
Hawaii47.18$15.33$172.43$53.34

Charging time

Time to add 100 miles of range to the 2025 Tesla Model S Plaid (19in wheels).

  • Level 1, 1.44 kW

    120 V, 12 A

    22 h 34 min per 100 mi

    4.4 miles of range per hour

  • Level 2, 3.84 kW

    240 V, 16 A

    8 h 28 min per 100 mi

    11.8 miles of range per hour

  • Level 2, 7.68 kW

    240 V, 32 A

    4 h 14 min per 100 mi

    23.6 miles of range per hour

  • Level 2, 9.60 kW

    240 V, 40 A

    3 h 23 min per 100 mi

    29.6 miles of range per hour

  • Level 2, 11.52 kW

    240 V, 48 A

    2 h 49 min per 100 mi

    35.5 miles of range per hour

Full charge from empty

2025 Tesla Model S Plaid (19in wheels): time to charge from empty to full (113 kWh from the wall for 348 mi of EPA range)
ChargerPowerTime from emptyRange added per hour
Level 1 — 120 V, 12 A1.44 kW78 h 31 min4 mi
Level 2 — 240 V, 16 A3.84 kW29 h 26 min12 mi
Level 2 — 240 V, 32 A7.68 kW14 h 43 min24 mi
Level 2 — 240 V, 40 A9.60 kW11 h 47 min30 mi
Level 2 — 240 V, 48 A11.52 kW9 h 49 min35 mi

A full charge costs about $20.53 at the U.S. average price of 18.16¢/kWh, however long it takes.

AC charging speed is also limited by the car's onboard charger, and charging slows near 100%. Try the charging time calculator or read how long it takes to charge a Tesla.

Questions people ask

How much does it cost to charge a Tesla Model S?

About $5.90 per 100 miles and $66.37 a month for 13,500 miles a year at the U.S. average price of 18.16¢/kWh, for the 2025 Tesla Model S Plaid (19in wheels).

How efficient is the Tesla Model S?

EPA rates current Tesla Model S trims at 27.1 to 36.2 kWh per 100 miles, with 309 to 410 miles of range.

Where is it cheapest to charge a Tesla Model S?

Nevada, at about $46.49 a month; the most expensive is Hawaii at $172.43.

How long does a Tesla Model S take to charge at home?

About 22 h 34 min per 100 miles on a 120 V outlet and 4 h 14 min per 100 miles on a 7.68 kW Level 2 charger. From empty to its full 348-mile EPA range: about 14 h 43 min at 7.68 kW and 9 h 49 min at 11.52 kW, if the car's onboard charger accepts that power.

How many kWh does it take to charge a Tesla Model S?

About 113 kWh from the wall to go from empty to the full 348-mile EPA range of the 2025 Tesla Model S Plaid (19in wheels) (348 mi × 32.5 kWh/100 mi). That includes charging losses, so it is a little more than the battery holds. At 18.16¢/kWh that is about $20.53.

Data updated October 26, 2026. Sources: EIA Electric Power Monthly (August 2026 residential prices), EIA weekly gasoline prices (October 19, 2026), EPA vehicle data. See the methodology.